Live6/7 chargers online · 4 charging · 8 free3 connectors offline
+0530
Mount Lavinia Point

Connector #1

Availablecn-6a

CP-MTL-01 · ABB Terra 54 · OCPP 1.6J

heartbeat 11s ago
Type
CCS2
DC
Rated power
60 kW
60 kW
Meter
10,400.2
kWh lifetime
Tariff
LKR 900
per kWh

Remote commands

Gated by this charger's declared capabilities · every command is audit logged

No session running

Not supported by this charger model

Command history

Request → result for every remote action

TimeCommandByResultDetail
12:41:09StatusNotification (in)chargeracceptedPreparing / NoError

Current session

No active session.

Raw OCPP messages

Last exchanges on this charge point

  • INMeterValues12:53:04
    {"connectorId":2,"meterValue":[{"sampledValue":[{"value":"9412","measurand":"Energy.Active.Import.Register","unit":"Wh"}]}]}
  • INHeartbeat12:52:59
    {}
  • INMeterValues12:52:04
    {"connectorId":2,"meterValue":[{"sampledValue":[{"value":"8930","measurand":"Energy.Active.Import.Register","unit":"Wh"}]}]}
  • INStartTransaction12:41:12
    {"connectorId":2,"idTag":"APP-7F31","meterStart":21903800,"timestamp":"2026-07-16T12:41:12Z"}
  • OUTRemoteStartTransaction12:41:10
    {"connectorId":2,"idTag":"APP-7F31"}
  • INStatusNotification12:41:09
    {"connectorId":2,"status":"Preparing","errorCode":"NoError"}
  • INAuthorize12:40:58
    {"idTag":"APP-7F31"}