← Mount Lavinia Point
Connector #2
Unavailablecn-6bCP-MTL-01 · ABB Terra 54 · OCPP 1.6J
heartbeat 11s ago
Type
Type2
AC
Rated power
7 kW
7 kW
Meter
2,201.6
kWh lifetime
Tariff
LKR 520
per kWh
Remote commands
Gated by this charger's declared capabilities · every command is audit logged
No session running
Not supported by this charger model
Command history
Request → result for every remote action
| Time | Command | By | Result | Detail |
|---|---|---|---|---|
| 12:41:09 | StatusNotification (in) | charger | accepted | Preparing / NoError |
Current session
No active session.
Raw OCPP messages
Last exchanges on this charge point
- INMeterValues12:53:04
{"connectorId":2,"meterValue":[{"sampledValue":[{"value":"9412","measurand":"Energy.Active.Import.Register","unit":"Wh"}]}]} - INHeartbeat12:52:59
{} - INMeterValues12:52:04
{"connectorId":2,"meterValue":[{"sampledValue":[{"value":"8930","measurand":"Energy.Active.Import.Register","unit":"Wh"}]}]} - INStartTransaction12:41:12
{"connectorId":2,"idTag":"APP-7F31","meterStart":21903800,"timestamp":"2026-07-16T12:41:12Z"} - OUTRemoteStartTransaction12:41:10
{"connectorId":2,"idTag":"APP-7F31"} - INStatusNotification12:41:09
{"connectorId":2,"status":"Preparing","errorCode":"NoError"} - INAuthorize12:40:58
{"idTag":"APP-7F31"}